Success Stories
Real Results from M&F Trading's Integrated Solutions
These case studies demonstrate how M&F Trading's integrated approach—combining SEW-Eurodrive drives, Moret Mining components, and comprehensive technical support—transforms operational efficiency across Mozambican industries.
Case Study 1: Mining Sector
Optimization of Conveyor Belts in a Coal Mine
The Challenge
A large coal mine in Mozambique operated with an old conveyor belt system suffering frequent breakdowns. The conveyor lines had constant stoppages for bearing repairs and replacement of damaged idlers. Production was regularly interrupted, causing ship loading delays and penalty costs.
Our Solution
Phase 1: Drive & Mechanical Upgrade
- New SEW-Eurodrive gearmotors on main drive pulleys
- Variable frequency drives for smooth speed control
- Moret Mining idlers and support structures
- Re-lagged and realigned head/tail pulleys
- Impact beds at loading zones
Phase 2: Monitoring & Lubrication
- Vibration and temperature sensors at critical points
- Data acquisition for predictive maintenance
- Automatic lubricators on main bearings
- Knowledge transfer to maintenance team
Results Achieved
Conveyor Availability
(from 85%)
Throughput Increase
Maintenance Costs
Downtime Reduction
Case Study 2: Food & Beverage
Automation and Upgrade of a Beverage Bottling Line
The Challenge
A beverage company needed to increase production by 50% at one of its soda bottling plants to meet growing market demand. The existing line had limited capacity with 1990s equipment, showing inefficiencies and long downtime for format changeovers.
Our Solution
Automation Upgrade
- SEW stepper motors on bottle feeders
- Gearmotors on belt conveyors
- Servo drives on labeling systems
- Central PLC control with cascade VFDs
- Coordinated speed control across line
Reliability Improvements
- Food-grade bearings for sanitary operation
- Vibration/temperature sensors on key motors
- Online monitoring system with alerts
- Automatic lubrication systems
- Operator training on new HMI system
Results Achieved
Bottling Speed
(10k to 15k bottles/hour)
OEE Achieved
(from 60-70%)
Production Bottlenecks
Case Study 3: Ports & Logistics
Increasing Efficiency in Port Operations – Bulk Cargo Terminal
The Challenge
A Mozambican port terminal specializing in bulk cargo (fertilizers and grains) was struggling to meet throughput targets. Infrastructure that had been in operation for decades resulted in below-target ship loading rates. The terminal risked losing contracts and faced safety incidents from abrupt equipment stoppages.
Our Solution
Equipment Modernization
- High-efficiency SEW motors (IE3) on ship loaders
- VFDs for soft starts and speed adjustment
- Moret idlers/pulleys with anti-corrosion treatment
- Belt scrapers and alignment systems
- Misalignment and speed monitoring
Control & Monitoring
- Sealed bearings for dusty environments
- Centralized lubrication system
- SCADA system for real-time monitoring
- Visual/audible alarms for operators
- Overnight installation during vessel windows
Results Achieved
Loading Rate
(exceeded 15% target)
Mechanical Failures
(first 12 months)
Safety Incidents
(material spills)
ROI Period
What Makes M&F Projects Successful
Integrated Approach
Combining drives, mechanics, and monitoring for holistic solutions
Local Expertise
On-site support and knowledge transfer to client teams
Minimal Disruption
Phased implementations during maintenance windows
Measurable Results
Clear ROI with documented performance improvements
Ready to Transform Your Operations?
Let M&F Trading bring the same integrated approach and proven results to your facility.
Discuss Your Project Explore Our Solutions